Plaster is protect your wall to defect but if you have a problem with your plaster work,so we should be ensure about its quality.
Before Wall Plastering-
- Wall must be clean and free from all dust ,loose material ,grease ,oil etc.
- Wall must be wet for a few hours before plastering work.
- Apply a net mesh on RCC and brick joints.
- Plaster must be apply in three coats.
- Every coats of plaster must have a gap of 3-5 day for proper set and shrinkage.
- All Plaster shrinks on drying.
- First coat should be strong.A strong coat should not be applied on weaker coat.
- All electrical conduit pipe fitting must will be completed.
- Plumbing work is also be completed in case of kitchen and Bathroom.
- Its should be uniform.
- Check proper on all edges on its first coat.
- Ceiling plaster should be first and after start wall plaster.
- Plaster mortar should not be too wet (watered).
- Plastering Sand should not be too fine.