How to start Your Plot Marking.

Survey of plot is most important and first part of building construction,it should be in Engineer's supervision or in talented mason.First you read and understand the plan drawing with the help of engineer/Architect.

Material Required.

  1. Plan drawing /Site Layout Drawing
  2. Plumb
  3. Thread
  4. Meter Tape
  5. Chalk Powder
  6. Steel Cut pieces
  7. Bricks 
  8. Sand 
  9. Cement
  10. Water
  11. Water Level pipe (If possible use auto level)
  12. Paint 
  13. Brush
  14. Labor
  15. Mason 
Before starting marking of plot/site ,you should be organised a small prey of God (Pooja) and invites friends and relative.

Steps- How to start-

  1. Pooja 
  2. Material Arrangement
  3. Check required plinth level and actual Level
  4. Now next work is done from Mason ,Labor and Engineer.
Be ensure about all layout and check dimension if you have not Engineer for Supervision.


No comments:

Post a Comment